登 录 免费注册 全国统一客服电话:400-676-1800 《中国能源招标投标网》是中国政企交互型电子招投标领导品牌 进入办公平台


招标公告 招标变更 采招业主会


全项目跟踪 规划施工


明星企业 企业资讯


焦点视点 技术创新
中标公告 废标公告 流标与答疑 拟在建项目 可研环备 产品选型 资质选型 政策法规 展会信息
所在位置:网站首页 招标公告 正文
中国石油天然气管道工程有限公司伊拉克分公司新纳西里亚油库项目第二轮工程设计、采购和施工(EPC)的轻质原油主泵区建筑和基础工程招标公告
公告名称:
中国石油天然气管道工程有限公司伊拉克分公司新纳西里亚油库项目第二轮工程设计、采购和施工(EPC)的轻质原油主泵区建筑和基础工程招标公告
所属地区:
0
发布时间:
2025-04-10
详细内容:

Buildings and Foundations Works-2nd Round


Bidding Announcement
Buildings and Foundations Works of Light Crude Oil Main Pump Area (WORK) for the Engineering, Procurement and Construction (EPC) for new Nassiriya Depot Project-Second Round.


1 INTRODUCTION
This RFT document is issued to subcontract the Buildings and Foundations Works of Light Crude Oil Main Pump Area (WORK) for the Engineering, Procurement and Construction (EPC) for new Nassiriya Depot Project.
1.1 China Petroleum Pipeline Engineering Company Limited - Iraq Branch (“CPP”) has, issued this Request for Tender (“RFT”) to selected bidders (each a “Bidder”) in order to obtain bid submissions in relation to the project described in brief in Item 3 below and in more detail in the scope of work set out in Appendix 6 to this RFT (“Scope of Work”).
1.2 Following submission of the Bids, CPP may select one or more Bidder(s) to enter into a legal agreement with CPP in the form set out in Appendix 10 to this RFT (“Agreement”). The Agreement shall detail the Scope of Work, the terms and conditions and agreed fees pursuant to which CPP may engage the selected Bidder(s) to perform all or part of the Scope of Work.
2 DEFINITION
Project Owner: The Oil Projects Company (SCOP)
Tenderee: China Petroleum Pipeline Engineering Company Limited - Iraq Branch
Tendering Agent: China Petroleum Pipeline Material and Equipment Company Limited
Bidder: The subcontractor/service provider who will take part in the Bidding
3 SCOPE OF WORK
3.1 Buildings and Foundations Works of Light Crude Oil Main Pump Area for the Engineering, Procurement, and Construction (EPC) of the New Nassiriya Depot procurement and construction activities shall include, but are not limited to:
Local Control Center for Light Oil Main Pumps;
Lodge Building for 7 Persons in Light Oil Main Pumps Area;
Steel Shed for Gas Turbine and Main Pump;
Pipe Support and Equipment Foundation for Light Crude Oil Main Pump Area;
Pipe Sleeper for Heavy Crude Oil Main Pump Area;
Pipe Supports and Equipment Foundations for External Area of Main Pump Shed.
For detailed requirements and specifications, refer to Appendix 6 of this document.
3.2 Selected Bidder will be engaged to carry out the Buildings and Foundations Works of Light Crude Oil Main Pump Area (WORK) for the Engineering, Procurement and Construction (EPC) for new Nassiriya Depot to enable the construction of above-mentioned work..
3.3 The Scope of Works is to be completed within the timeframe provided by CPP.
4 SUBMISSION OF BIDDING DOCUMENTS
4.1 Bidding documents shall be composed of TWO parts, Technical Proposal (Un-priced) and Commercial Proposal.
In case of any issue needs to be clarified, please inform the Tenderee in a written form (the Clarification Template attached with the RFT Files), and sent to the following email addresses:
liudong@ and CC to liuming@ (Mrs. Liuming)
If the bidder has any objection to the technical, commercial requirements in the tendering documents, the bidder is requested to clarify in writing to the Tenderee within 7 days of receipt of the tendering documents, and no clarification will be accepted after the deadline. If no clarification is provided to the Tenderee, it will be deemed that the bidder can meet all the technical and commercial requirements. The Tenderee has the right to reject the deviation items pointed by Bidder and regard the bidding documents as unqualified.
4.2 Acquisition of Tendering Documents
Time of receiving the tendering documents (Request for Tender): 9:00 AM on 10th April 2025 to 5:00 PM on 18th April 2025 (Abu Dhabi time, the same below).
Those who intend to participate in the bidding, please contact with Mr. Liu Dong to obtain the tendering documents.
Contact person: Mr. Liu Dong
Tel:+971 544793568
E-mail: liudong@
4.3 Submission of Bidding Documents
Bidding documents shall be composed of two components, a Technical Proposal (Unpriced) and a Commercial Proposal.
The Technical proposal shall be submitted to bidding@ before 9:00 AM (Abu Dhabi Time), 21st April 2025.
The Commercial proposal shall be submitted to bidprice@ before 9:00 AM (Abu Dhabi Time), 21st April 2025. The Commercial Proposal shall be encrypted. The encrypted password shall be sent to the email box separately: liuming@.
The overdue delivery of the bid documents will be rejected, and the delivery time shall be subject to the time of the designated email ID.
4.4 Should the Bidder fail to submit before the aforesaid deadline, the Proposal Documents will be rejected. The time presented in the e-mail shall be considered as the submission time.
4.5 Before the deadline indicated above, the Bidder is entitled to request the Tenderee to check whether the proposals have been successfully delivered to the assigned email address by sending the email to the undersign.
4.6 Before 3 days ahead of the deadline indicated above, the Bidder is entitled to request the Tenderee to postpone the deadline for no more than 7 days in total in case of puzzles/difficulties happening to the vendors for preparing the bidding documents.

5 Bid Opening
Time: 9:00 AM (Abu Dhabi Time), 21st April 2025;
Place: 50th Floor, Addax Office Tower, Al Reem Island, Abu Dhabi, UAE

6 The Media of the Announcement
This tender announcement is issued on: China Petroleum Pipeline Engineering Co. Ltd. Iraq Branch
Contact person: Mrs. Liu Ming
Email: liuming@

Tendering Agent: China Petroleum Pipeline Material and Equipment Company Limited
Address: 50th Floor, Addax Office Tower, Al Reem Island, Abu Dhabi, UAE
Contact person: Mr. Liu Dong
Tel:+971 544793568
E-mail: liudong@

7 Special Instructions to Bidders
7.1 The Bidder shall submit all required bidding documents in both PDF and Editable version to convenient Tenderee evaluation work.
7.2 Tenderee reserves the right of final interpretation for the tendering documents and confirmation of the Buyer.
8 Qualification documents including but not limited to:
The Bidder shall provide the project organization chart and key personnel list.
The Bidder shall provide the Company Registration Certificate at least with the validity to 2025.
The Bidder shall provide the Tax License at least with the validity to 2025.
The Bidder shall provide a list of relevant project experiences in the last three years.
The Bidder shall provide an equipment, manpower, office facilities etc. plan.
The Bidder shall provide a QHSE management plan.
Bidder shall provide financial statement of the past three years.

附件:Bidding Announcement Buildings and Foundations Works-2nd


推荐业主单位 更多
 
1
北京中油建设项目劳动安全卫生预评价有限公司
 
2
大庆油田公司第九采油厂
 
3
北京中油建设项目劳动安全卫生预评价有限公司
 
4
大庆油田公司采气公司
 
5
大庆油田工程有限公司环境规划评价技术研究所
 
6
大庆油田有限公司第五采油厂环保部
 
7
大庆油田工程有限公司环境规划评价技术研究所
 
8
大庆油田有限责任公司第二采油厂
 
9
大庆油田有限责任公司第十采油厂
 
10
大庆油田工程有限公司
 
11
大庆油田有限责任公司第七采油厂
 
12
大庆油田工程有限公司
 
13
大庆油田有限责任公司第九采油厂
 
14
大庆油田工程有限公司
 
15
大庆油田有限责任公司第二采油厂
友情链接 申请友情链接:service#cpeee.com
化工招标网
关于我们 | 联系我们 | 会员服务 | 入网流程 | 付款方式 | 法律声明 QQ在线:51311961 QQ交谈
Copyright © 2008-2018  中国能源招标投标网  版权所有    网站所载内容及排版格式受版权法保护  严禁转载!
政府单位:国务院国有资产管理委员会  |  中华人民共和国财政部 1